Load Evaluation with Fast Decoupled-Newton Raphson Algorithms: Evidence from Port Harcourt Electricity
Loading...
Files
Date
Journal Title
Journal ISSN
Volume Title
Publisher
Advances in Science, Technology and Engineering Systems Journal
DOI
Abstract
The undulated power supply has dropped to its worst reliability index in most parts of the
city despite the installations of distribution transformers to improve the power. In this work,
examination of Port Harcourt Town Zone 4 (Z4), Rivers State power distribution system
forcing on its operation, planning for future expansion of the system, and sharing of power
between utilities was done. The objective was to unravel the problematic recurrent
blackouts as a result high power loss, that is (I2
R) in the line; low voltage profile, poor cos∅
at the load end, excessive loading of feeder transformers, and conductors rating inadequacy
at the receiving end of the 33KV Distribution part of the substation. A comprehensive study
was carried out on the system with the formation of node admittance matrix. Programmable
codes were written using MATLAB script to resolve the static power flow equations defined
applying Fast decoupled-Newton Raphson calculation procedure centered on the
advantages of time and PC memory space (PC-MS). Thus, the node voltage and the other
variables like branch flows and phase angles were gotten, and network losses were reduced.
However, the results obtained were compared with that gotten from Electrical Transient
Analyzer Program (ETAP) application software. It was seen that the two results got were
related. The general net power gotten was (129.741 MW, 83.818 MVAr) applying the Fast
Decoupled-Newton-Raphson load flow technique in MATLAB programming environment
after the addition of receptive power through the means of the capacitor bank to the affected
nodes. The total net power that is real and reactive got employing ETAP programming were
(125.765 MW, 92.782 MVAr).
The overall line losses were enhanced by 0.246 reductions. That is from (4.75MW,
10.05MVAr) to (3.58MW, 7.57MVAr) of the entire real power losses